The Trung Son Hydropower Project (TSHP) was designed with a strong gender action plan for the implementation of its large livelihood, minority, and resettlement program. While the plan and overall aim were considered very good practice,…
The second study State-Level Energy Efficiency Implementation Readiness has its genesis from the existing structure of India’s EE and electricity governance framework, where states have an important role to play to achieve the…
This report gives guidance to project developers and financial institutions on to how to estimate emissions, ex ante, from geothermal power projects, especially those being considered for financing by The World Bank and other multilateral…
The manual begins with a description of the concept and aims of the shield wire scheme (SWS). The scheme is applicable for minimum cost power supply from the grid to villages, small towns, farms, factories, and water pumping stations…
This report presents a comparative assessment of an array of approaches that have been applied around the world, with varying degrees of success, to mitigate resource risks and catalyze investments in developing the geothermal sector.…
Access to energy has been measured traditionally in binary terms—either having access or not. However, this method does not capture the multiple aspects of access—capacity, duration, quality and reliability, affordability, and safety—and…