Rural Electrification with The Shield Wire Scheme in Low-Income Countries

The manual begins with a description of the concept and aims of the shield wire scheme (SWS). The scheme is applicable for minimum cost power supply from the grid to villages, small towns, farms, factories, and water pumping stations located near or at some distance from the route of the high-voltage (HV), 110 to 330 kV, transmission lines (TLs).

The SWS is a solution for rural electrification that is not economically justifiable with conventional solutions, which are long medium-voltage (MV) lines routed along the HV TLs or dedicated HV/MV transformer stations. SWSs consist of the following: Insulating the shield wires (SWs) from the towers of the HV TL for MV operation (20 to 34.5 kV). Energizing the SWs at MV from the HV/MV transformer station at one end of the HV TL. Using the earth return of current as an MV distribution conductor. Supplying the loads by means of medium-voltage/low-voltage (MV/LV) distribution transformers connected between the SWs and the ground.

Users also downloaded
Increasing access to modern electricity services in Sub-Saharan Africa is one of the main development challenges facing the world over the next two decades. The rural economies are overwhelmingly…
August 10, 2017
This report evaluates the use of rural electrification concessions in Africa. It provides a comprehensive overview of successful and failed cases and identifies the likely factors behind successes.…
June 26, 2017
This report is prepared within the project Selection : 1231900/ Solar Measurement Campaign in Vietnam. Under this project a two-year solar measurement campaign as a stand-alone activity funded from a…
May 23, 2017
This report is prepared within the World Bank ESMAP project Selection: 1231900 or solar measurements in Vietnam. Under this project at least five solar measurement stations funded from a World Bank…
May 23, 2017